Implementation of the NPT Safeguards Agreement and Relevant Provisions of Security Council Resolutions in the Islamic Republic of Iran (GOV/2014/10)

February 20, 2014

Weapon Program: 

  • Nuclear

Main Developments

  • Iran has implemented the six initial practical measures that it agreed with the Agency in November 2013 in relation to the Framework for Cooperation and both parties have agreed on the next seven practical measures to be implemented by Iran by 15 May 2014, including one measure related to the information contained in the Annex to the Director General’s November 2011 report.
  • On 24 November 2013, the E3+3 and Iran agreed on a Joint Plan of Action (JPA). The JPA took effect on 20 January 2014, and the Board of Governors endorsed the Agency undertaking monitoring and verification in relation to the nuclear-related measures set out therein (see Annex III).
  • Enrichment of UF6 above 5% U-235 is no longer taking place at FEP and FFEP. The amount of nuclear material that remains in the form of UF6 enriched up to 20% U-235 is 160.6 kg. A proportion of this material is being downblended and the remainder is being converted to uranium oxide.
  • Enrichment of UF6 up to 5% U-235 continues at a rate of production similar to that indicated in the Director General’s previous report. No additional IR-2m or IR-1 centrifuges have been installed at FEP, FFEP or PFEP (production area). The amount of nuclear material that remains in the form of UF6 enriched up to 5% U-235 is 7609 kg.
  • An updated Design Information Questionnaire (DIQ) for the IR-40 Reactor has been provided to the Agency. No additional major components have been installed at this reactor and there has been no manufacture and testing of fuel for the reactor.
  • Managed access has been provided to the Agency to centrifuge assembly workshops, centrifuge rotor production workshops and storage facilities.

Attachment: